Westbound Control Signal. Leaving the 16.5 mile stretch of double track CTC that began at "Becker", entering the 29 mile stretch of double track ABS/TWC that ends at "Gregory" There is a double crossover and a spur to the yard in St. Cloud. The yard is operated by the Northern Lines RR. they load roack trains and grain shuttles. |
Date:
11/25/2012 |
Location:
Saint Cloud, MN Map ![Show Saint Cloud on a rail map](/images/map_us.gif) |
Views:
98 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Matt Hagfors |
|
Author: Matt Hagfors
|
![BNSF "St. Cloud" Staples Sub. CTC.](http://s3.amazonaws.com/rrpa_photos/66495/WB%20Control%20Signals%20St.%20Cloud%20JCT..JPG) |
Picture Categories: |
This picture is part of album: Track and Signals in Minnesota. |