Bring up the rear. It didn't sound like he was working very hard at this point. About a 1/2 mile ahead a fair up grade is made into Roaring Spring. /DL |
Date:
10/22/2011 |
Location:
Vicksburg, PA Map ![Show Vicksburg on a rail map](/images/map_us.gif) |
Views:
236 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
Locomotives: Rolling Stock: |
Author: David Larrabee
|
![EV 1828 southbound](http://s3.amazonaws.com/rrpa_photos/73373/2011%2010%2022%201352%20EV%20Xing%20Brookes%20Blvd,%20Vicksburg,%20Pa011%20(2).JPG) |
Picture Categories: Passenger,Action |
This picture is part of album: End of the Day on The Everett |